Middle School/30th Street

Description
Project

El Dorado Middle School/30th Street

Location
El Dorado, KS
Details
  • Site Layout
    • Worked with architect to meet parking requirements, aesthetics and site efficiency demands
  • Drainage
    • Designed two dry detention ponds to ensure post-construction runoff was < pre-construction runoff
    • Designed onsite storm sewer
    • NOI/SWPPP
  • Grading
    • Terraced entire site to balance earthwork
    • Had to account for 30′ of elevation difference across the site
    • Provided grading machine control files to contractor to ensure quality control and construction efficiency demands were met
  • 30th Street Design
    • Worked closely with the City of El Dorado to meet their specifications and standards
    • Designed all storm sewer and performed necessary drainage calculations
    • Provided grading machine control files to contractor to ensure quality control and construction efficiency demands were met