Industrial Wastewater Lagoon

Description
Project

Industrial Wastewater Lagoon Design

Location
Woodward, OK
Details
  • Designed a new 10.0-million gallon industrial wastewater total retention lagoon with impermeable HDPE liner
  • Performed water balance calculations to verify sizing of lagoon
  • Designed piping and valves to connect the existing facilities to the new lagoon
  • Coordinated design of lagoon side slopes with owner to address safety concerns
  • Assisted the owner with permitting through the Oklahoma Department of Environmental Quality