Elevator & River Barge Terminal

Description
Project

Grain Elevator & River Barge Terminal

Location
Tunica, MS
Details
  • 1/4-mile long conveyor bridge from elevator to Mississippi river
  • Conveyor towers built in Mississippi River floodway
    • Permitted through state of Mississippi
    • Showed “no-rise” using HEC-RAS
  • Provided entire civil design: roads and utilities
  • Deep foundation design – auger-cast piles
  • Entire structural design – bins, pits and tower foundations
  • Barge Fleeting Terminal
  • Construction oversight